Project Location
Dunmanway, County Ireland
Client
Suir Engineering (Acting ICP)
Description
One of IES Utility Solution’s specialist HV teams supported Suir Engineering at Dunmanway Wind Farm to complete the installation of 110kV XLPE cable joints to UK and Irish HV standards, along with joint bay construction and cable preparation. We delivered straight joints and cross bonded configurations to support the long distance EHV circuit design, covering all stages from sheath preparation and conductor crimping through to insulation rebuild and stress control. Full 110kV HV testing was completed, with comprehensive ICP documentation provided to enable Suir Engineering to finalise the connection.

