Project Location
St Bees, Cumbria
Client
United Utilities
Description
IES Utility Solutions delivered a 900-metre water main installation in St Bees, Cumbria, for United Utilities. Utilising trenchless directional drilling techniques, the team installed a new 90mm main while minimising surface disruption across the route. Despite challenging weather and ground conditions, the project was completed ahead of programme, achieving a high-quality installation and ensuring continued service reliability for the local area.
Key Stats
- 900 metres of new water main installed
- 90mm pipe installed using trenchless technique of directional drilling
- 5-person project site team
- 6-week programme for mains rehabilitation