Project Location
Arlecdon, Cumbria
Client
United Utilities
Description
IES Utility Solutions delivered a mains rehabilitation project in Cumbria, as principal contractor, using the trenchless method of pipe insertion for 1.4km water mains. Completed over the course of 6 weeks the team worked through strong wet weather conditions along the mains across fields, country lanes and farmland. The project involved rehabilitating a 10 inch water main by installing a 160mm PE liner along the full length of the affected network, including associated preparation, insertion and reinstatement activities required to return the asset to service.
Key Stats
- 1467metres of mains replaced using the trenchless method of pipe insertion