Project Location
Winkburn Solar Farm, Nottinghamshire
Client
Sonnedix
Description
IES Utilities Solutions was engaged by Sonnedix to deliver the EHV 132kV four pole terminal structure and associated earthing for the Winkburn Solar Farm in Newark, Nottinghamshire. Although an outline design already existed, our team undertook a full design review and necessary amendments as part of taking on the works. The project scope included engineering, project management, a full technical design review, site supervision, structure construction, and installation of 2no. bonding connections to the new 132kV substation.
Key Stats
- Technical Design Review and build of 132kV four-pole terminal structure
- 2no. bonding connections to new substation
- Clear interfaces with NGED for contestable / non contestable boundaries
- Mobilised within 4 weeks