Case Studies

Precision Cable Installation Delivered in Demanding Offshore Conditions

Challenge

  • Operating within offshore environmental constraints, including temperature, wind and humidity limits
  • Managing confined cable routing through complex, multi-voltage offshore substation structures
  • Coordinating delivery across multiple OEMs and contractors within an integrated offshore programme
  • Ensuring full compliance with a wide range of standards, including DNV, BS, IEC, ENA and UK transmission codes

Solution

  • Implemented structured pre-installation planning, including development of MSRAs, ITPs and coordination with SAP processes
  • Delivered cable installation activities using IES-supplied specialist equipment and lifting aids to ensure safe and efficient handling
  • Installed Pfisterer MV joints in full accordance with OEM requirements, ensuring performance and reliability
  • Completed HV termination works alongside cleat reinstatement to maintain system integrity
  • Carried out high-voltage testing with full certification provided for each circuit
  • Installed Brattberg cable transit seals to protect GIS penetrations
  • Executed all works within defined offshore environmental operating limits, ensuring safety and compliance throughout

Outcome

  • Successfully delivered fully compliant MV–HV cable systems aligned with DNV, BS, IEC and ENA standards
  • Verified electrical integrity through successful high-voltage testing and certification
  • Installed systems designed to support a 25-year offshore platform design life
  • Achieved effective delivery within a complex, multi-contractor offshore environment
  • Enhanced client confidence through comprehensive documentation, quality assurance and controlled delivery processes
Precision Cable Installation Delivered in Demanding Offshore Conditions

Project Location

North Sea

Client

Moray West on Behalf of Equans

Description

IES Utility Solutions supplied specialist MV–HV cable installation, jointing, termination, testing and sealing works for the Moray West Offshore Wind Farm substations on behalf of Equans. The project included cable pulling, routing and cleat installation, the installation of Pfisterer Size4 MV joints and earthing connections, and HV/MV terminations into 66kV and 220kV GIS equipment. In addition, the project involved the installation of Brattberg cable transit seals, development of MSRAs, ITPs and HV testing procedures, and the execution of HV testing to IEC60840 and IEC62067 standards.

Key Stats

  • Installation of Pfisterer Size4 MV joints and earthing connections
  • HV / MV terminations into 66kV and 220kV GIS Equipment