Working alongside Equans in Germany, we delivered specialist 220kV subsea and transition joining works for the Ostwind offshore transmission system, ensuring a secure power export from offshore generation to the German grid.
Scope
This project included the installation of subsea joints on offshore export cables, the construction of transition joints between subsea and land cable sections, and the execution of all jointing activities in line with OEM procedures and international HV standards. Providing support to the wider transmission installation and commissioning programme.
Challenges
One of the key elements of work was managing the complex interfaces between the subsea and land cable systems, as they demand flawless alignment and preparation to ensure the transition jointing happened smoothly. The team had to follow strict compliance with the NKT and OEM-specific jointing methodologies alongside elevated safety and quality requirements typical of German high-voltage transmission projects.
Approach
To carry out the highly skilled project we deployed our senior, fully certified jointers trained in 220 kV subsea and transition jointing.
Outcomes and benefits to the client
As a result our team completed a successful installation of all 220 kV subsea and transition joints, demonstrating our capability in delivering high-voltage works for major European grid projects.